From: route@monster.com
Sent: Saturday, April 16, 2016 2:07 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
ANTONIA CHAMBERS
12586
Huntington Trace, Alpharetta, GA 30005 Antonia.chambers@gmail.com 470-255-8747 Objective: To gain the position of a Wireless Project Manager where my
ten years of progressive telecommunication wireless experience will
contribute towards the growth of the organization.. Skills/Keywords: Sprint-Siterra, MS Office, NSN, COP, DAS ALU-FST, RRU, RBS 3106, 3206, GPS, construction
management, PM Ericsson- Site Handler, integration, commissioning,
LTE, Small Cell TEMS, 4G, VOLTE, VoIP, NOC, site audits, Fiber, LMR Work History: National Cell Site Construction Manager
(ALU/Sprint)
Jan. 2013-Dec. 2014 MPI Industries, LLC – Boston, MA, remote work from
home in GA ·
Responsible for the overall planning,
budgeting, and document keeping aspects of the cell site closeout process for
Sprint’s Network Vision and 2.5 Commissioning and Integration Project ·
Developed and executed strategic plans in order to ensure
that quality COP (Close Out Packages) were delivered ·
Extensive knowledge of Sprint’s Siterra and ART Tool
databases ·
Worked closely with upper management to make sure that the
scope and the direction of our project was on schedule ·
Project budgeted at 300M ·
Assisted ALU financial team each month with managing
billing and receivables, along with processing vendor submitted SAF ·
Identified that all OOS submitted invoicing was correct
and approved ·
Managed tiger teams on Blitz Cleanup project ·
Trained field CMs and GC on the processes involved in
completing closeout packages ·
Held quarterly safety and quality meetings for the NE
region. ·
Conducted weekly meetings with project team to discuss
change order requests, quality issues, and any risks, assumptions or constraints
in regards to the project ·
Built strong solid work relationships by providing timely,
accurate, and high quality information to our customer and upper management ·
Reviewed As-Built/Red-Lined CD’s as needed Field Cell Site Construction Manager (ALU/CSpire)
May 2012-Jan.2013 MPI Industries, LLC – Jackson, MS and Biloxi, MS ·
Scheduled pre-construction site walks with GC’s to
identify any pre-existing conditions prior to construction start ·
Held safety meetings, inspected all permits, and
made sure that all equipment used on the towers were in proper working
condition ·
Sign completed JSA forms ·
Attended daily market calls with ALU market lead for site
construction statuses and SAP approvals ·
Obtained any special permits/clearances needed to gain
access to government restricted areas ·
Created BOM’s ( Bill of Materials) for each new cell site
and uploaded PDF to FST ·
Reviewed all closeout documents and photos ·
Informed RF team of any need changes to be made to the
site’s RFDS ·
Scheduled post-construction site walks with GC, signed any
red-lined CD’s Commissioning Engineer/Team Lead
Mar.2012-May 2012 New World Technology, Inc. – Dallas, TX ·
NSN (Nokia Siemens Network) Flexiswap Project ·
Preformed installation, commissioning, and integration of
Nokia FlexiBTS ·
Software and Hardware upgrades ·
Cleared on-site alarms ·
Monitored Anritsu sweeps testing for VSWR, return loss,
and DTF ·
Perform functionality tests (video calls, mms) ·
Site Acceptance Construction Manager
(Ericsson/T-Mobile/Claro)
Dec.2011-Mar.2012 Tangent International – San Juan, PR ·
Supervised equipment delivery and installation ·
Antenna and RRU swaps ·
Integrated 1st and 2nd carrier
UMTS equipment ·
Coordinated the day-to-day activities of both the
contractors and the vendors while they finished up final punch lists and site
walks ·
QC/QA ·
Maintenance window site cut-overs Field Test Supervisor (Ericsson/AT&T) Astron Consulting – New York City and the
Surrounding Boroughs,
NY
Jan. 2011-July 2011 ·
Followed Ericsson MOPs, test plans ·
Installed RAX/TX60 boards into 3206 UMTS cabinets along
with 2nd carrier
radios and filters ·
Repositioned RF LTE jumpers ·
Installed SIAD, MU, Fiber, GPS and GPS receivers ·
EMAS, Site Handler, DAM, DUL scripting Network Integration Carrier Add Engineer
(Ericsson/TMO)
July 2010-Jan 2011 Avenger Engineering – Biloxi, MS ·
Integrated both 1st and 2nd carrier
UMTS 3206 cabinets ·
Installed RAX/TX60 cards for nationwide LTE upgrade ·
Provided detailed drawing of all the other carriers in the
cell site compound ·
Took pre and post install photos if the equipment and the
compound Microwave Pathing Technician (New World
Technology/Clearwire)
Feb.2009-Mar.2010
Teksystems – Greensboro, High point, Winston Salem,
NC ·
Responsible for the installation and programming of
Dragonwave’s Horizon Duo Modem, Ceragon Modem, Orthogons, PTP600/400
Microwave equipment ·
Ran -48V power cables from breaker box to the equipment
cabinet ·
Cleared trouble tickets during the maintenance window with
the NOC ·
Loaded scripts containing frequency, capacity, and TX
power information ·
Achieved target RSL levels that were within a -2dBm error
margin ·
Worked with commissioning team to bring new site build on
air ·
CPP Certified ·
Provided customer support by going out on truck rolls
troubleshoot Clearwire Modem issues Switch Site Auditor (Bridge Networks/Sprint)
Apr.2008-Jan.2009 Teksystems – Charlotte, NC and Norfolk VA ·
Performed switch audit on all connected equipment ·
Responsible for locating and documents all DSX1/DSX3/ODX
bay positions along with LEC/MANRING locations ·
Input relay rack, patch panel, and port locations of the
equipment associated with that switch ·
Documented all OC3/OC12 Motorola information ·
T1 aggregators ·
SPM, VPU, MGX, DTC, VM Nortel ·
Gathered all onsite information and created a plan that
would ensure that the switch was energy efficient Education: Surry Central High School – Diploma 2002 10+ years of Telecom Experience in various roles Certifications: CPR CPP connectors Ericsson HS1/B3 References: Available Upon Request |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|